Turnkey roll waterproofing

Сервис United Building

Turnkey roll waterproofing

We protect structures from moisture and leaks using roll waterproofing systems. We work on residential, commercial, infrastructure, and industrial projects across Uzbekistan.

07

What It Includes

Substrate preparation, Cleaning and priming

06

Types of Work

Roof waterproofing, Foundation waterproofing

04

Work Stages

Site inspection, Solution preparation

Навигация по странице

Обзор

О чём эта услуга

What It Is

Roll waterproofing is the installation of a protective layer on structural surfaces using torch-applied or adhesive membranes that prevent water penetration.

Description

We use roll materials for roofs, foundation walls, underground parts of buildings, terraces, and other areas where stable protection from atmospheric and ground moisture is required. We select the system according to operating conditions and the substrate type.

The quality of surface preparation, priming, seam sealing, junction detailing, and treatment of complex nodes is critical. This affects the watertightness and service life of the system.

Состав работ

Что входит и какие направления доступны

What It Includes

  • Substrate preparation
  • Cleaning and priming
  • Cutting and fitting of materials
  • Installation of the first layer of waterproofing
  • Installation of a second layer if necessary
  • Processing seams and junctions
  • Checking the tightness of components

Types of Work

  • Roof waterproofing
  • Foundation waterproofing
  • Basement waterproofing
  • Waterproofing terraces
  • Waterproofing the basement
  • Protection of underground structures

What We Offer

01

Leak protection

We form a continuous barrier to moisture in critical areas.

02

Working with Nodes

We pay special attention to junctions, seams and entries.

03

Selection of a system for an object

We take into account the base, load and operating mode.

04

Long lasting results

A well-laid roll system operates over a long cycle.

Work Stages

01

Site inspection

We evaluate the base, humidity and risk areas.

02

Solution preparation

We select the material, the number of layers and the design of the device.

03

Execution of works

We prepare the base and lay roll waterproofing.

04

Inspection and handover

We check the seams, connections and readiness of the site for use.

Запрос по услуге

Submit a request

Leave a request, and we will prepare a solution for your project.

FAQ

Where is roll waterproofing used?

On roofs, foundations, basements, terraces and other areas with high water load.

What determines the service life?

From the quality of the base, material, number of layers and correctness of the units.

Is it possible to complete only a single section?

Yes, we connect both to the entire facility and to a specific zone.

Submit a request

Let's discuss your tasks, find the optimal solution, and schedule the work. We will answer your questions and provide details on current promotions. Stay in touch!

Partnership Request

Start collaborating with United Building right now. We will answer your questions and provide detailed information about the partnership terms. Quick response within 24 hours!